Geoclima Asia - production facility

Geoclima Asia has started its race

The 3000 m2 Geoclima Asia production facility in Thailand – with its 2000 kW test center – is now fully operational and first chiller units have been assembled and tested and now are waiting to be delivered to the site of installation.
Geoclima Thailand is going to be a fundamental reference point for Geoclima Australasia and an important base for the Asian market.
After the one-month training period the Thai personnel completed in Italy last year, Italian specialized technicians are now in Thailand to supervise the production and testing works.
This strong collaboration between Italian headquarters and Thai new production facility is fundamental to ensure high standard procedures and to be able to provide the same product and the same quality all over the world.