Background
In 2010 Geoclima developed chiller units on behalf of Barclays for its cutting-edge Dart mega data centre.
Purposes
The project had to meet specific requirements: compact size, low noise level, reliability and maximum customisation such as glycol production at low temperatures at night for a system of accumulation of ice.
Project
The project required 12 air cooled chillers TMA 1.4 MW each, equipped with Turbocor compressors, LPA system and hybrid control system.
Results
It has been estimated that Turbomiser will save over 554 tons of CO2 compared with a free cooling solution. This has resulted in a unique project, developed from specific requirements. A really customised solution with high technology, meeting all Dart strictest standards.